October 19, 2026 07:54 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Four killed in fresh Manipur violence as protesters take bodies to Chief Minister’s residence | Tiger Shroff firing: Three accused arrested on train in Rajasthan, suspected Bishnoi gang link emerges | 'Internet access a fundamental right for children': SC rejects age-based 'blanket' ban | 'We will fight our own government': RG Kar victim's father threatens fresh protest after Sandip Ghosh gets bail | RG Kar shocker: Sandip Ghosh gets bail as only 7 of 147 witnesses examined, junior doctor blasts CBI | Trump waives Russia-related sanctions | 'How dare Elon Musk?' Owaisi defends Modi after billionaire's 'real boss' jibe at Ambani | 'B****y S***': IAS officer's abuse of female colleague during virtual J&K meeting sparks row | Aamir Khan’s nephew Imran Khan asked to leave India by Oct 28 after joining anti-CEC protest | ‘Their crime? Demanding justice’: Rahul Gandhi slams 4 AM detention of Ankita Bhandari’s parents
UNI

BHEL clinches order for 40 MW Rahughat Hydroelectric Project in Nepal

| @indiablooms | Feb 03, 2020, at 05:35 pm

Mumbai/UNI:  BHEL has won an order for the ElectroMechanical (EM) works for the 40 MW Rahughat Hydroelectric Project in Nepal.

The order has been placed on BHEL by the Raghuganga Hydropower Limited (RGHPL), a company 100 per cent owned by Nepal Electricity Authority (NEA) the sole public power utility in Nepal and owned by the Nepal government.

The project is majority funded by EXIM Bank of India in the form of a soft loan, along with funding from NEA and the Nepal government. WAPCOS, India is the project consultant, BHEL said in a filing with BSE.

The order for Rahughat HER, located in the Raghuganga municipality of Myagdi district of Nepal, envisages design, engineering, manufacturing, supply, erection and commissioning of the complete electro-mechanical package involving supply of two Vertical Pelton Turbines (20 MW each) along with associated equipment, matching generators, governors, controls & instrumentation, protection system, transformers, 220 KV switchyard and balance of plant (BoP) packages.

Major equipment for the contract will be manufactured and supplied by BHEL's plants at Bhopal, Jhansi, Rudrapur and Bengaluru, while the installation activities onsite will be carried out by the company's Power Sector - Northern Region division, Noida.

This is the second consecutive success for BHEL in the hydro power sector of Nepal. Last year, BHEL had won a prestigious order for the largest Hydropower project in Nepal - 900 MW Arun-3 HEP, which is presently under construction.  

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.