October 09, 2026 08:02 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
‘Restriction, not complete closure’: Supreme Court questions Delhi shutdown ahead of CJP protest | 'Unwarranted': India hits back at JD Vance over ‘indentured servants’ remark amid US Green Card crackdown | US targets Microsoft, Infosys, Tata in green card crackdown | ‘Bold and inventive’: Canadian poet Anne Carson wins 2026 Nobel Prize in Literature | ‘Attempt to destabilise world’s largest democracy’: 42 retired judges rally behind Gyanesh Kumar over ‘vote chori’ row | ‘Vote chor, gaddi chod’: Dhruv Rathee, Prakash Raj join Bengaluru protest against Gyanesh Kumar | India condemns Houthi attacks on Saudi airports, calls targeting of civilian infrastructure unacceptable | Dalal Street bloodbath: Investors lose Rs. 8 lakh crore as Sensex crashes over 1,000 points | Amazon layoffs hit India, US and UK: Fresh job cuts rock e-commerce giant amid festive shopping season | Bollywood mourns Nana Patekar: Anupam Kher, Akshay Kumar, Jr NTR, Suniel Shetty pay emotional tributes
Gurugram Metro
Representational image (Credit: Wikimedia Commons)

Cabinet approves metro connectivity from Gurugram's HUDA City Centre to Cyber City, with spur to Dwarka Expressway

| @indiablooms | Jun 08, 2023, at 05:32 am

New Delhi: The Union Cabinet on Wednesday approved a metro connectivity project from HUDA City Centre to Cyber City with spur to Dwarka Expressway, Gurugram covering a distance of 28.50 km having 27 stations on the route.

The total completion cost of the project will be Rs 5,452 crore.

This will be a standard gauge line of 1435 mm (5 ft 8.5 inches).  The entire project will be elevated.

The spur from Basai village has been provided for connectivity to the depot.

The project is proposed to be completed in four years from the date of sanction of the Project and is to be implemented by Haryana Mass Rapid Transport Corporation Limited (HMRTC) which will be set up as a 50:50 Special Purpose Vehicle (SPV) of the Government of India and Government of Haryana after sanction order is issued.

Commerce and Industry Minister Piyush Goyal said in a press conference that the project cost will be shared by the Centre and the state besides an international development assistance loan.

As of now, there is no metro line in Old Gurugram, but there are plans to establish one that would connect New Gurugram with Old Gurugram.

The 27 stations in this line are: HUDA City Centre – Sector 45 – Cyber Park – Sector 47 – Subhash Chowk – Sector 48 – Sector 72A – Hero Honda Chowk – Udyog Vihar Phase 6 – Sector 10 – Sector 37 – Basai Village – Sector 9 – Sector 7 – Sector 4 – Sector 5 – Ashok Vihar – Sector 3 – Bajghera Road – Palam Vihar Extension – Palam Vihar – Sector 23A – Sector 22 – Udyog Vihar Phase 4 – Udyog Vihar Phase 5 – Cyber City

The spur to Dwarka Expressway (Sector 101)

This proposed metro network is also expected to have a connection with the Indian Railway station. In its subsequent phase, the metro line aims to provide convenient connectivity to the Indira Gandhi International (IGI) airport.
The introduction of this metro line is anticipated to contribute to the overall economic development of the area.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.