August 17, 2026 05:39 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
After SC rebuke, BCI chief apologises to NALSAR students over enrolment freeze row | Independence Day: PM Modi’s big youth pitch— AI training, free coaching amid exam row and job concerns | ‘Shakti Ki Saptadhara’: Modi reveals 7 pillars to power India’s next leap in his I-Day speech from Red Fort | West Bengal STF arrests 3 more suspected Pakistani spies in Cooch Behar | Bengal man arrested in Bengaluru over terror links, Afghanistan travel plan | Ajit Doval breaks silence on Operation Sindoor in Discovery’s explosive new docuseries | Rahul Gandhi's 'mock hug' taunt sparks row; Centre stresses 'mutual respect' with Italy | Delhi on high alert: Bomb threat to High Court, airport and multiple locations ahead of I-Day | ‘Who are they to interfere?’: CJI Surya Kant slams Bar Council of India over NALSAR students’ enrolment row | 'Shows how low Congress has sunk': BJP slams Rahul Gandhi over Modi foreign policy jibe
Economic Survey
Indian government tables Economic Survey in Parliament. Photo Courtesy: PIB

Govt's capital expenditure on key infrastructure sectors grew at a rate of 38.8 per cent from 2019-20 to 2023-24: Economic Survey

| @indiablooms | Jan 31, 2025, at 06:30 pm

The Economic Survey tabled in the Indian Parliament on Friday said the Union Government‘s capital expenditure on key infrastructure sectors has grown at a rate of 38.8 per cent from 2019-20 to 2023-24.

The survey stated that in 2024-25, capital expenditure picked up momentum between July and November 2024.

The survey was tabled by Union Finance Minister Nirmala Sitharaman in the Parliament.

The power sector network continues to expand, with installed capacity rising by 7.2 per cent year-on-year to 456.7 GW as of November 2024.

The addition of transformation capacity also gained momentum this year. In the shift towards renewable energy, the power sector has been bolstered primarily by large-scale solar and wind initiatives.

By the end of December 2024, the country's total renewable energy installed capacity increased by 15.8 per cent year-on-year (YoY), reaching 209.4 GW, up from 180.8 GW in December 2023.

With the implementation of the Revamped Distribution Sector Scheme, the daily average power supply has improved from 22.1 hours in FY14 to 23.4 hours in FY24 in the urban areas and from 12.5 hours in FY14 to 21.9 hours in the rural areas.

The gap between energy demand and supply has also declined from 4.2 per cent in FY14 to a mere 0.1 per cent by December 2024.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.