August 17, 2026 06:10 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
After SC rebuke, BCI chief apologises to NALSAR students over enrolment freeze row | Independence Day: PM Modi’s big youth pitch— AI training, free coaching amid exam row and job concerns | ‘Shakti Ki Saptadhara’: Modi reveals 7 pillars to power India’s next leap in his I-Day speech from Red Fort | West Bengal STF arrests 3 more suspected Pakistani spies in Cooch Behar | Bengal man arrested in Bengaluru over terror links, Afghanistan travel plan | Ajit Doval breaks silence on Operation Sindoor in Discovery’s explosive new docuseries | Rahul Gandhi's 'mock hug' taunt sparks row; Centre stresses 'mutual respect' with Italy | Delhi on high alert: Bomb threat to High Court, airport and multiple locations ahead of I-Day | ‘Who are they to interfere?’: CJI Surya Kant slams Bar Council of India over NALSAR students’ enrolment row | 'Shows how low Congress has sunk': BJP slams Rahul Gandhi over Modi foreign policy jibe
India's Renewable Energy capacity as of Sept 2024 is 201 GW. (Photo courtesy: Unsplash)

India's RE capacity to hit 250 GW by March 2026

| @indiablooms | Nov 20, 2024, at 01:06 pm

New Delhi: India's renewable energy capacity is projected to reach 250 GW by March 2026, supported by a robust project pipeline exceeding 80 GW, according to a report by ICRA on Tuesday.

This growth is attributed to a notable increase in tendering activity in FY2024, the rating agency stated, PTI reported, citing the ICRA report.

ICRA estimates that India’s installed renewable energy capacity, including large hydro projects, will rise from 201 GW in September 2024 to approximately 250 GW by March 2026.

Girishkumar Kadam, Senior Vice President & Co-Group Head - Corporate Ratings at ICRA, highlighted the significant contribution of rooftop solar and commercial and industrial (C&I) segments to this growth.

However, he noted that challenges such as delays in land acquisition and transmission connectivity could hinder progress if unresolved.

ICRA also projected an energy storage capacity requirement of 50 GW by 2030, which will be fulfilled through battery energy storage systems (BESS) and pumped storage hydro projects (PSP).

India aims to achieve an ambitious 500 GW renewable energy capacity by 2030.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.