October 19, 2026 07:54 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Four killed in fresh Manipur violence as protesters take bodies to Chief Minister’s residence | Tiger Shroff firing: Three accused arrested on train in Rajasthan, suspected Bishnoi gang link emerges | 'Internet access a fundamental right for children': SC rejects age-based 'blanket' ban | 'We will fight our own government': RG Kar victim's father threatens fresh protest after Sandip Ghosh gets bail | RG Kar shocker: Sandip Ghosh gets bail as only 7 of 147 witnesses examined, junior doctor blasts CBI | Trump waives Russia-related sanctions | 'How dare Elon Musk?' Owaisi defends Modi after billionaire's 'real boss' jibe at Ambani | 'B****y S***': IAS officer's abuse of female colleague during virtual J&K meeting sparks row | Aamir Khan’s nephew Imran Khan asked to leave India by Oct 28 after joining anti-CEC protest | ‘Their crime? Demanding justice’: Rahul Gandhi slams 4 AM detention of Ankita Bhandari’s parents
Image credit: Free wallpaper

New production from KG D6 Project on track to start by mid-2020: Reliance

| @indiablooms | Feb 04, 2020, at 12:08 am

Mumbai/IBNS: The RIL-BP joint venture on Monday confirmed that it has completed the safe cessation of production in a planned manner, from the D1 D3 field in Block KG D6 (KG-DWN-98/3), off the east coast of India. The D1 D3 field was India’s first deepwater gas field to be put on production in April 2009.

The RIL-BP joint venture has successfully worked to extend the life of production from the D1 D3 Field which otherwise would have ceased production in 2015 due to issues of reservoir pressure and water ingress.

Through innovation and application of solutions, the field’s life was extended for almost five years, to Feb 2020, maximizing the recovery from the field.

The KG D6 Block has so far produced an overall 3 TCFe resulting in energy import savings of over USD 30 billion. These fields also established several global benchmarks in terms of operational performance including 99.9 % uptime and 100% incident-free operations.

As already informed, the JV has committed an additional $5 billion (Rs. 35,000 Crores) of investments towards monetizing about 3 TCFe (about 500 Million Barrels of Oil equivalent) reserves from three projects - R cluster, Satellite cluster and MJ fields. These projects will utilize the existing gas production infrastructure.

Further, this infrastructure can act as a hub for the development of any discovery from contiguous areas.

The first-gas from these fields is expected in mid-2020. The peak production from these three fields is expected to reach 1 BCFe per day which is about 15% of the then envisaged India’s demand.

Image credit: Free wallpaper


 

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.