August 16, 2026 01:00 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
After SC rebuke, BCI chief apologises to NALSAR students over enrolment freeze row | Independence Day: PM Modi’s big youth pitch— AI training, free coaching amid exam row and job concerns | ‘Shakti Ki Saptadhara’: Modi reveals 7 pillars to power India’s next leap in his I-Day speech from Red Fort | West Bengal STF arrests 3 more suspected Pakistani spies in Cooch Behar | Bengal man arrested in Bengaluru over terror links, Afghanistan travel plan | Ajit Doval breaks silence on Operation Sindoor in Discovery’s explosive new docuseries | Rahul Gandhi's 'mock hug' taunt sparks row; Centre stresses 'mutual respect' with Italy | Delhi on high alert: Bomb threat to High Court, airport and multiple locations ahead of I-Day | ‘Who are they to interfere?’: CJI Surya Kant slams Bar Council of India over NALSAR students’ enrolment row | 'Shows how low Congress has sunk': BJP slams Rahul Gandhi over Modi foreign policy jibe
Photo : meil.in

NHAI suspends Megha Engineering from fresh bids for a year over lapses in Kerala highway project

| @indiablooms | Jun 18, 2025, at 09:40 pm

Thiruvananthapuram: The National Highways Authority of India (NHAI) has suspended Megha Engineering & Infrastructures Limited (MEIL) from participating in any new tenders for one year, media reports said.

The action stems from the company’s failure to carry out proper slope protection and drainage works on the Chengala–Neeleshwaram stretch of National Highway 66 in Kerala, according to a Business Today report.

Show cause notice and penalty

MEIL has been served a show cause notice regarding the one-year debarment, which may also carry a financial penalty of up to ₹9 crore.

The company had been awarded the contract to widen a 77-kilometre stretch of NH-66 from Chengala–Neeleshwaram to Thaliparamba, under the Hybrid Annuity Model (HAM).

The HAM structure mandates the concessionaire to maintain the highway section for a 15-year period.

As both the promoter and concessionaire of the project, MEIL is now obligated to reconstruct the damaged slope protection at its own expense.

Expert committee formed for review

In response to the lapses, NHAI has constituted an expert committee to assess the situation.

The panel includes a senior scientist from the Central Road Research Institute (CRRI), a retired professor from IIT-Palakkad, and representatives from the Geological Survey of India (GSI).

The committee will examine the project’s design, evaluate construction quality, and suggest corrective measures.

The NHAI has emphasised that it is taking all necessary measures to uphold safety and accountability in both ongoing and upcoming infrastructure projects.

MMRDA scrapped MEIL tenders in May

Separately, in May, the Mumbai Metropolitan Region Development Authority (MMRDA) cancelled tenders worth ₹14,000 crore for two major infrastructure projects, following a Supreme Court intervention.

The tenders had controversially been awarded to MEIL despite it being the higher bidder.

L&T approaches Supreme Court

Engineering major L&T had approached the Supreme Court last month after MMRDA rejected its bids for two key projects under Mumbai’s coastal road initiative.

These included a road tunnel between Gaimukh and Fountain Hotel Junction, and an elevated road along the Thane–Ghodbunder corridor.

The tunnel road project had attracted bids from L&T, MEIL, and three other companies in July 2024.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.