May 07, 2026 08:15 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Who after Mamata in Bengal? Amit Shah to meet BJP MLA-elects ahead of May 9 oath | Vijay’s TVK seeks Congress, Left support after falling short of majority in Tamil Nadu | Jolt to TMC! Supreme Court rejects plea challenging central staff deployment at Bengal counting centres | Bangladesh MP warns of refugee crisis if BJP wins West Bengal polls | Diplomatic row: Bangladesh summons Indian envoy over Himanta Biswa Sarma remarks | Supreme Court grants Pawan Khera anticipatory bail in case over allegations against Himanta Biswa Sarma's wife | ‘Not necessary to humiliate me with arrest’: Pawan Khera to SC over remarks on Himanta Biswa Sarma’s wife | ‘Let’s not choose for people capable of choosing’: Supreme Court to Centre on teen pregnancy termination | I-PAC co-founder Vinesh Chandel gets bail after Bengal polls conclude | Exit Polls Give Bengal to BJP—But One Survey Begs to Differ

No shortage of Power for West Bengal: NTPC

| | Apr 04, 2016, at 07:30 pm
New Delhi. Apr 4 (IBNS) There is a dip in the water level at Farakka Feeder Canal due to diversion of water to Bangladesh as per the international treaty and as a result, NTPC said it has been forced to temporarily stop five units (1600 MW) out of its six units (2100 MW) at Farakka.

Currently, one unit of 500 MW is under operation. 

The situation is likely to continue till Apr 10

"However there will not be any shortage of power to the West Bengal as a result of these closures," NTPC said in a statement.

"The total allocation to West Bengal from NTPC stations is 786 MW, which can be fully met by NTPC from its stations, if power is requisitioned by the State. In fact, even now Farakka and Kahalgaon Stations are not fully scheduled, leading to partial loading. If required by the State, NTPC can also supply more than its allocation to West Bengal by supplying surplus power from NTPC stations. The State has also surrendered its 199 MW power allocation from NTPC Barh Stage-II (2X660 MW) in the State of Bihar," it said.

In short, enough power is available with NTPC to meet any requirement of the state, NTPC said.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.
Related Videos
RBI announces repo rate cut Jun 06, 2025, at 10:51 am
FM Nirmala Sitharaman presents Budget 2025 Feb 01, 2025, at 03:45 pm
Nirmala Sitharaman on Budget 2024 Jul 23, 2024, at 09:30 pm