August 22, 2026 05:15 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Rahul Gandhi stages dharna at Delhi police station over CJP protest crackdown, targets Amit Shah | CJP school tour turns chaotic in Jaipur: Cars vandalised, stones pelted as Ashutosh Ranka alleges BJP ‘goons’ attack | Vande Mataram row: Kangana Ranaut slams Sharmila Tagore, says ‘come out of Hindu-Muslim mindset’ | Jadavpur erupts again: ABVP-SFI clash, police barricades shattered as fresh tension grips area | Ex-Congress MP and 1984 anti-Sikh riots convict Sajjan Kumar dies while serving life sentence | India hits back at Pakistan: Structures outside High Commission demolished in Delhi | ‘Don’t daydream about my bedroom’: Kangana Ranaut fires back at Ramdev over ‘Gen Z’ row | Jadavpur University erupts at midnight: ABVP-Left student groups clash over meeting, BJP-CPI(M) leaders trade barbs | Vijay govt calls for action to stop students, youth from joining CJP, Left protests | Kolkata hotel fire kills 9: Bengal Minister Agnimitra Paul targets ex-TMC govt, CESC over licences

Arunachal Pradesh CM inaugurates Daporijo bridge over video conferencing

| @indiablooms | Apr 21, 2020, at 05:51 pm

Guwahati/IBNS: Arunachal Pradesh Chief Minister Pema Khandu on Monday inaugurated the Daporijo bridge over Subansiri river over video conferencing.

The bridge on Daporijo River is a strategic link towards the LAC between India and China.

The bridge is now opened for vehicular movement.

Amid ongoing nationwide lockdown, Daporijo bridge over Subansiri river has been constructed by Border Roads Organisation (BRO), keeping in mind utmost precautions against COVID-19 so as to connect this strategic Line of Communication in Arunachal Pradesh.

All supplies, rations, constructional material and medicines pass over this bridge.

Old Bridge developed cracks which could lead to a major catastrophe like on 26 July 1992 when a passenger bus fell off the bridge leaving no survivors.

With the intervention of DGBR and CE Arunank expeditious sanctions were obtained from the Ministry of Defence (MoD) and Arunachal Pradesh government.

The difficult and dangerous launch was completed in record time adhering to all COVID-19 precautions.

Work had started for construction of the bridge on March 17 this year by 23 BRTF.

Finally, after 27 days on Apr 14, the bridge was jacked down successfully and safely on the supports.

It has been successfully upgraded from class 24 tons to class 40 tons, thereby, allowing heavier vehicles to pass catering for not only Army requirements but the future Infrastructure development requirements of Upper Subansiri district. 

Safe and early execution of the bridge represents the seamless coordination and cooperation between the BRO, MoD and Arunachal Pradesh government.

(By Hemanta Kumar Nath, Guwahati)

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.