April 30, 2026 07:43 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
‘Not necessary to humiliate me with arrest’: Pawan Khera to SC over remarks on Himanta Biswa Sarma’s wife | ‘Let’s not choose for people capable of choosing’: Supreme Court to Centre on teen pregnancy termination | I-PAC co-founder Vinesh Chandel gets bail after Bengal polls conclude | Exit Polls Give Bengal to BJP—But One Survey Begs to Differ | Big defence push: Rajnath Singh to hold high-stakes talks with Italy’s Defence Minister | “Voting without fear”: PM Modi hails record turnout in West Bengal polls | Mamata Banerjee trying to intimidate Hindu voters, alleges Suvendu Adhikari in Bhabanipur | Operation Sindoor boost: India is now fifth-largest military spender at USD 92.1 billion in 2025, Pakistan's spending is also up | ‘Got the guts?’ Derek O’Brien dares Modi to quit if Mamata Banerjee wins Bengal polls | ECI ‘harassing’ TMC, dancing to BJP’s tune: Mamata Banerjee in Bhabanipur
Ganderbal

Jammu and Kashmir: DC reviews status of HWCs at Ganderbal

| @indiablooms | Mar 16, 2021, at 11:28 pm

Srinagar: The Deputy Commissioner (DC) Ganderbal, Shafqat Iqbal today chaired a meeting of the Health department to review the status of approved Health Wellness Centers (HWCs) in the district.

During the meeting, the DC was briefed through a PowerPoint presentation about the status of Health Institutions approved as Health and Wellness Centers block wise in the district, man power approved and utilization of funds.

The meeting was informed that 73 health institutions are approved as HWCs which include PHC, NTPHC and Sub Centers of the district.

While giving the details about approved Health Institutions as HWCs, it was given out that in 2020-21, 30 HWCs are approved and remaining were approved in 2018-19 and 2019-20.

Regarding the status of manpower, the CMO informed that 54 posts of MLHPs are sanctioned out of which 36 are in position.

The meeting also discussed the status of utilization of funds for equipment and repair and renovation of HWCs.

It was informed that in 2018-19, Rs 33 lakh was received for repair and renovation and Rs 6 lakh was received for equipment besides in 2019-20, Rs 1.31 crore was received out of which Rs 72 lakh is utilized on equipment and repair and renovation.

Meanwhile, the meeting also discussed the status of work progress on ongoing PHCs and NTPHCs in the district for which DC asked the Executive Engineer to expedite all the works in a planned manner to complete the infrastructure within stipulated timeline.

He also urged him to carry frequent field visits to inspect these works so that quality is ensured.

The meeting was attended by the Chief Planning Officer, Irfan Ahmad Giri, CMO, Dr. Mehraj-u-din, Executive Engineer R&B, DHO, BMOs and others concerned 

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.