August 20, 2026 05:41 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Jadavpur erupts again: ABVP-SFI clash, police barricades shattered as fresh tension grips area | Ex-Congress MP and 1984 anti-Sikh riots convict Sajjan Kumar dies while serving life sentence | India hits back at Pakistan: Structures outside High Commission demolished in Delhi | ‘Don’t daydream about my bedroom’: Kangana Ranaut fires back at Ramdev over ‘Gen Z’ row | Jadavpur University erupts at midnight: ABVP-Left student groups clash over meeting, BJP-CPI(M) leaders trade barbs | Vijay govt calls for action to stop students, youth from joining CJP, Left protests | Kolkata hotel fire kills 9: Bengal Minister Agnimitra Paul targets ex-TMC govt, CESC over licences | Kolkata hotel fire: 9 Bangladeshi nationals, including women and a child, die in massive blaze | Tarun Tejpal faces life term? Goa govt moves Supreme Court after 2013 rape conviction | Supreme Court rejects ‘less painful’ death penalty plea, but leaves door open for future change
Kashmir
UNI

Jammu and Kashmir: ERA repairs Jahangir Chowk Rambagh Road, locals express gratitude 

| @indiablooms | Sep 18, 2020, at 02:57 pm

Srinagar: Scores of commuters, shopkeepers and locals of Jahangir Chowk-Rambagh on Wednesday expressed gratitude to the Economic Reconstruction Agency (ERA) for repairing the road stretch from Jahangir Chowk to Rambagh. 

Rising Kashmir had reported the issue and highlighted the dilapidated condition of Jahangir Chowk-Rambagh Road which was causing inconvenience to the commuters, shopkeepers and locals. 

In response, ERA has come into action on the ground and redressed the issue in time. As per the locals, shopkeepers and commuters ERA has recently repaired JahangirChowk- Rambagh Road. 

The road stretch from Jahangir Chowk to Rambagh was in shambles since 2011 owing toconstruction of Jahangir Chowk Flyover Bridge. 

A driver, Showkat Ahmad said that he is very happy and thankful to the Rising Kashmir team who raised this issue to know the ground reality about the road and talked to theconcerned officials. 

“I also thank the ERA for this positive step in the direction of making Srinagar a smart city,” he said.

 Another shopkeeper Haji Maqbool Baba said that he hopes that the waterlogging issueshall also be resolved with this. 

“Commuters won’t get their clothes dirty by the splashes of water anymore as therepairing of the road has taken place,” he said. 

Another local Aijaz Ahmad said that it is not lip service anymore as the Economic Reconstruction Agency has taken a practical step.

“I hope that Rising Kashmir will keep raising the issues and other departments shall comeforward and work for the benefits of the common masses,’’ he said.

Talking Rising Kashmir, Chief Engineer, Roads and Buildings Showkat Jeelani said that ERA is executing the work presently of rigid pavement in the Jahangir Chowk to Rambaghsection with their workmanship and quality control.

 “ERA will set new standards of road construction in the valley,” Chief Engineer said.  

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.