April 18, 2026 07:20 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
‘Panic reaction’: Rahul Gandhi on women’s bill, says PM Modi ‘wants to send a message’ | Adani Group shares rise as Gautam Adani becomes Asia’s richest, overtakes Mukesh Ambani | TCS Nashik ‘conversion’ case accused seeks anticipatory bail citing pregnancy | IT raids TMC candidate Debasish Kumar’s premises ahead of Bengal polls | Bengal SIR: Supreme Court allows voters restored by tribunal till April 21 and 27 to vote | 'Women won't spare you': PM Modi warns Opposition over resistance to quota bill | Vijay booked in 3 cases over poll code violation ahead of Tamil Nadu polls | 'Black law': Stalin burns copy of 'delimitation' bill, slams Modi govt | TCS halts Nashik BPO operations amid sexual abuse, conversion allegations | ‘We are surprised’: SC stays Pawan Khera’s bail over remarks on Himanta Biswa Sarma’s wife
Mumbai Metro
Image: Wikimedia Commons

Jindal Stainless supplies stainless steel for Mumbai Metro Project flagged off by PM Narendra Modi

| @indiablooms | Jan 20, 2023, at 09:51 pm

Mumbai: Giving an impetus to the government’s ‘Make in India’ initiative, the Hon’ble Prime Minister launched Phase 2 of the Mumbai Metro Line 2A and 7.

Jindal Stainless has supplied stainless steel for the outer panels, car body, structurals, roofs, interiors, underframes, and other stainless steel applications for the project.

The Mumbai Metro line was inaugurated by the PM in a Dedication Ceremony organized in Mumbai yesterday. The line will be opened for commute from today.

For this Mumbai Metro project, Jindal Stainless started supplying high-quality stainless steel grade 301LN in various tempers and in 2J finish. The supply, which started in January 2021, is expected to continue till December 2025.

Jindal Stainless is supplying material from its different manufacturing units across the country for the project.

The train sets are being developed by Bharat Earth Movers Limited (BEML) in batches and out of the total 576 coaches required for this project, 144 coaches have been supplied so far.

Approximately 5,760 metric tons of stainless steel would be consumed to develop 18.6 km 2A Metro line and 16.5 km 7 Metro line respectively.

Commenting on this development, MD, Jindal Stainless, Abhyuday Jindal, said, “As a completely recyclable metal, stainless steel is the most sustainable choice of material to enable a low-waste circular economy. We are always proud to partner metro and railway projects, playing our part in ensuring safe, sustainable, and hygienic commute for people.”

In the past, Jindal Stainless has supplied to metro projects in Sydney and Queensland, apart from Delhi, Kolkata, Bangalore, Chennai, and other metro projects. 

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.