August 17, 2026 05:06 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
After SC rebuke, BCI chief apologises to NALSAR students over enrolment freeze row | Independence Day: PM Modi’s big youth pitch— AI training, free coaching amid exam row and job concerns | ‘Shakti Ki Saptadhara’: Modi reveals 7 pillars to power India’s next leap in his I-Day speech from Red Fort | West Bengal STF arrests 3 more suspected Pakistani spies in Cooch Behar | Bengal man arrested in Bengaluru over terror links, Afghanistan travel plan | Ajit Doval breaks silence on Operation Sindoor in Discovery’s explosive new docuseries | Rahul Gandhi's 'mock hug' taunt sparks row; Centre stresses 'mutual respect' with Italy | Delhi on high alert: Bomb threat to High Court, airport and multiple locations ahead of I-Day | ‘Who are they to interfere?’: CJI Surya Kant slams Bar Council of India over NALSAR students’ enrolment row | 'Shows how low Congress has sunk': BJP slams Rahul Gandhi over Modi foreign policy jibe
Tunnel collapse
Image Credit: Image tweeted by Uttarkashi Police

Uttarakhand tunnel collapse: Rescue ops to take days with manual drilling, Army called in

| @indiablooms | Nov 27, 2023, at 03:27 am

The rescue operation to evacuate 41 trapped workers in a Uttarakhand tunnel for 15 days received another major blow as the giant drill working on their rescue collapsed. The Indian Army was called in to join the operation and was tasked with the manual drilling.

The blades of the auger machine got stuck in the debris as it was drilling through the rubble of the collapsed Silkyara tunnel.

The heavy drill brought in from America to break through nearly 60 meters of debris was damaged on Friday and is now being pulled out.

There are still the last 10-15 metres that need to be broken with hand-held power tools to evacuate the trapped workers.

Manual drilling would involve a worker entering the already bored stretch of the rescue passage, drilling for a brief period in the confined space, and then coming out to let someone else take over. Indian Army will helm the manual drilling.

A unit of Madras Sappers, an engineer group of the Corps of Engineers of the Indian Army, arrived at the site to assist in the rescue operations.

Trapped for over 360 hours, the 41 men may now have to wait for several more days, maybe weeks, before they are brought out safely.

Authorities have said they are safe, with access to light, oxygen, food, water and medicines.

The labourers have been trapped in a 400-metre buffer zone of the unfinished main tunnel since November 12 when a portion of the 4.5-km tunnel on the Brahmakhal-Yamunotri National Highway collapsed.

The tunnel - meant to join Silkyara and Dandalgaon in Uttarkashi - is a part of the Char Dham project.

The cause of the tunnel collapse has not been revealed by authorities.

Located in the Himalayas, the area is susceptible to landslides, earthquakes, and floods.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.