February 12, 2026 04:44 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Bangladesh poll manifestos mirror India’s welfare schemes as BNP, Jamaat bet big on women, freebies | Drama ends: Pakistan makes U-turn on India boycott, to play T20 World Cup clash as per schedule | ‘Won’t allow any impediment in SIR’: Supreme Court pulls up Mamata govt over delay in sharing officers’ details | India-US trade deal: ‘Negotiations always two-way’, says Amul MD amid farmers’ concerns | Khamenei breaks 37-year-old ritual for first time amid escalating Iran-US tensions | India must push for energy independence amid global uncertainty: Vedanta chairman Anil Agarwal | Kanpur horror: Lamborghini driven by businessman’s son rams vehicles, injures six | ‘Namaste Trump beat Howdy Modi’: Congress slams PM Over India-US trade deal | Historic India-US trade pact: Tariffs cut, $500B market opportunity unlocked! | Big call from RBI: Repo rate stays at 5.25%, neutral stance continues
Tunnel Collapse
Photo courtesy: X/UttarkashiPol

Uttarakhand tunnel collapse: Trapped workers five metres away from the rescuers

| @indiablooms | Nov 28, 2023, at 04:34 pm

Forty-one workers, who are trapped under the debris caused by the tunnel collapse in Uttarakhand's Uttarkashi for 17 days, are just five metres away from the rescue team, media reports said.

Manual horizontal drilling started on Monday at the Uttarakhand tunnel, reports said.

The process started this evening after the American Augur Drill broke again, its blades fouled up by an iron grill from the tunnel ceiling and other debris.

The work is being conducted by "rat miners"—labourers used to drill narrow shafts as part of a primitive method of coal extraction.

The vertical drilling to create an extra passageway has already progressed to 36 meters, officials said.

Manual drilling from top and side are the two methods on which rescue workers are focussing after several other methods failed. Horizontal drilling from the Barkot end of the tunnel is also in progress.

Neeraj Khairwal, Secretary, Uttarakhand government, said 24 rat miners will work 24 hours to remove manual debris. The work will be done in three shifts.

The Auger Machine, once in working condition, will push the 800-mm pipe forward as the manual drilling progresses.

The officials, however, refused to give a time frame for the rescue.

Manual drilling is a slow and labor-intensive process in which the rat-hole miners will go through the 800 mm pipe, drill manually, and bring out the debris with shovels.

With 10 to 12 meters left to reach the trapped workers and machine drilling options exhausted, manual drilling appears to be the only way forward, the authorities indicated.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.