August 15, 2026 08:49 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Ajit Doval breaks silence on Operation Sindoor in Discovery’s explosive new docuseries | Rahul Gandhi's 'mock hug' taunt sparks row; Centre stresses 'mutual respect' with Italy | Delhi on high alert: Bomb threat to High Court, airport and multiple locations ahead of I-Day | ‘Who are they to interfere?’: CJI Surya Kant slams Bar Council of India over NALSAR students’ enrolment row | 'Shows how low Congress has sunk': BJP slams Rahul Gandhi over Modi foreign policy jibe | From guns to glamour: Former women Maoists walk the ramp in Chhattisgarh | Netaji row: Suvendu Adhikari govt strips BJP MP Anant Maharaj of state honour | Sukhbir Badal attacked by Nihang Sikh with kirpan at Maharashtra gurdwara; assailant detained | ‘If you cannot do it, we will pass an order’: Supreme Court’s final warning to Centre on food labels | ‘Time to move on’: Bombay HC sends strong message in Vijay Mallya-bank dispute
Kashmir Tourism

Jammu and Kashmir: Div Com takes extensive tour of Dal, Nigeen Lake

| @indiablooms | Nov 06, 2020, at 12:41 am

 Srinagar: The Divisional Commissioner, Kashmir along with Vice Chairman Lakes and Waterways Development Authority (LAWDA) Wednesday took an extensive tour of Dal and Nigeen Lake.

On the occasion, the Divisional Commissioner took stock of manual and mechanical deweeding, Lily extraction in various sections.

He was informed that about 54600 labours have been engaged for manual deweeding till date and 152425 cum of weed besides 92444 cum of lily has been extracted during the current year.

The Div Com also inspected various types of Lake cleaning machines viz, operation of water master, weed harvesters and the dredger.

During the interaction and discussion with the Engineering team he was apprised about settling the basin at Telbal nallah and its purpose of arresting silt.

The Div Com also observed Lily extraction mechanically being done by newly procured high capacity deweeding machines obtained from DMRC, New Delhi.

He also inspected ongoing works of Doledemb and it was informed that about 28000 sq.meters of area has been cleared in a short span of two months and about 70 to 90 dumper loads of extracted lily have been removed on a daily basis. 

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.