February 05, 2026 12:53 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
‘Justice crying behind closed doors’: Mamata Banerjee slams ECI in Supreme Court, CJI Kant assures solution | Mummy, Papa, sorry: Three sisters jump to death after parents object to online gaming | Supreme Court raps Meta, WhatsApp: ‘Theft of private information, won’t allow its use’ | ‘Completely surrendered’: Congress slams Modi after Trump’s trade deal move | PM Modi thanks 'dear friend' Trump for tariff reduction, hails strong US–India partnership | Trump announces US–India trade deal, lowers reciprocal tariffs to 18% | After Budget mayhem, bulls return: Sensex, Nifty stage sharp recovery | Dalai Lama wins first Grammy at 90 | Firing outside Rohit Shetty’s Mumbai home: 4 arrested, Bishnoi Gang link emerges | Female suicide attackers emerge at centre of deadly BLA assaults that rocked Pakistan’s Balochistan
Pakistan
Photo Courtesy: Pixabay

Pakistan: NEPRA says Chinese power plants using inferior coal

| @indiablooms | Sep 23, 2023, at 12:49 am

The National Electric Power Regulatory Authority (Nepra), which is the power regulatory body of Pakistan, has exposed Chinese coal-fired power plants to using lower-quality imported coal.

According to reports, the plants had pledged to use coal with a calorific value of 6000 (CVs).

Not a single imported consignment meets the required standards and still they claim multi-billion rupees of capacity payments that are being collected from the public, reports The News International.

This revelation came to light during a public hearing conducted by Nepra on Thursday to review the existing mechanism, last revised in 2016, the newspaper reported.

Nepra Chairman Waseem Mukhtar headed the proceedings while the authority’s members including Mathar Niaz Rana (member Balochistan), Maqsood Anwar Khan (KP), Amina Ahmed (Punjab), and Rafique Ahmad Shaikh (Sindh) were in the presence.

It is important to mention that the coal-based current derated installed capacity is 6,777MW (foreign-funded on imported coal), with an outstanding capacity payment of a substantial Rs643 billion.

While citing documents, a Nepra member was quoted as saying by The News International, “Your documents say that you imported lower quality coal against what was promised in the agreements.”

Notably, the Sahiwal Coal Power Project, now known as Huaneng Shandong Ruyi (Pakistan) Energy (Limited), disclosed that it had imported multi-thousand tons of coal in July 2022 when prices were high, at a rate of Rs70000/ton ($380).

However, in response, the Nepra member said, "You claim capacity payment, but you don’t use costly coal.”

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.