May 12, 2026 12:47 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Suvendu Adhikari Cabinet clears BSF land transfer, census rollout, Ayushman Bharat in Bengal | Mamata govt's welfare schemes to continue: Bengal CM Suvendu Adhikari after first cabinet meeting | ‘One of life’s most emotional moments’: PM Modi performs grand Mahapuja at Somnath Temple | UPI trail cracks Suvendu Adhikari aide Chandranath Rath murder case; three arrested | Totally unacceptable: Trump rejects Iran’s peace plan in explosive showdown | Big defence boost: India successfully tests advanced Agni MIRV missile | India, Singapore unite for tough action against terror and transnational crime | TVK crosses majority mark with VCK, IUML support | I bow before Bengal: PM Modi’s powerful gesture at Suvendu Adhikari’s oath goes viral | Bengal turns a new page: Suvendu Adhikari takes oath as CM amid massive NDA show of strength

Kashmir: Fire station soon in Sonipat

| @indiablooms | Sep 07, 2019, at 07:19 pm

Chandigarh, Sep 7 (UNI) Haryana Urban Local Bodies Minister Kavita Jain on Saturday laid the foundation stone for the construction of fire station at a cost of Rs 3.5 crore in Sonipat.

Three new 33 KV power stations to be constructed at Sector-23, Rai and village Jatola in Sonipat, which would be completed at a cost of about Rs 10 crore.


Ms Jain said that besides these sub stations, foundation stone of three new 33KV substations would also be laid down soon, in villages Deepalpur, Jagdishpur and Nathupur-Saboli, to be constructed at a cost of about Rs 20 crore. Apart from this, the damaged electrical wires of Sonipat city would be replaced at a cost of Rs 5.5 crore. She said that boosting station is being constructed at Sector-23 to strengthen drinking water supply at a cost of Rs 25 crore.


BJP MP Ramesh Kaushik said that now, there would not be any electricity problem. He said that development works to the tune of Rs 1,600 crore are being carried out in Sonipat, of which, many works have been completed.


Rajiv Jain, Media Advisor to the Chief Minister, said that BJP has fulfilled about 15 years old demand of electricity in Sector-23 of Sonipat.  

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.